Year | Event |
---|---|
1980 | Registered as a Private Limited Firm with the name of Design Development Fabrication Company (DDFC). |
Set up a modest fabrication unit at a rented premises in Shadbagh, Lahore. |
Year | Event |
---|---|
1982 | Shifted Workshop to self-owned property at Kot Lakhpat Industrial Estate, Lahore. |
Year | Event |
---|---|
1984 | Started hygienic grade fabrication for Food Processing & Pharmaceutical Industries. The following equipment was added for this: Dish end forming & Flanging Machine, Automatic Seam Welding machines & Distortion Removing Machine. |
Year | Event |
---|---|
1985 | Developed machine for polishing Stainless Steel Tanks. |
1986 | Developed direct expansion electric motor & diesel engine driven Milk Chilling Units. |
1989 | Licensing agreement with Beel Industrial Boilers Plc, U.K. for Packaged Smoke Tube Fired & Waste Heat Recovery Boilers. |
Technical Collaboration with M/s. Dontare Ltd., U.K. for Water & Waste Water Treatment Plants. |
Year | Event |
---|---|
1992 | Design and construction of first Waste Water Treatment Plant undertaken for ICI Polyester, Sheikhupura. |
First Fired Boiler manufactured. | |
Technical collaboration with M/s. Lurgi GmbH, Germany for Solvent Extraction Plants. |
Year | Event |
---|---|
1995 | First Waste Heat Recovery Boiler manufactured. |
1997 | Re-incorporated as DDFC (Pvt.) Ltd. |
Year | Event |
---|---|
1998 | Obtained the ISO 9001:1994 Quality Management certification. |
Technical collaboration with M/s. Aalborg Industries, Sweden for Water Tube Waste Heat Recovery Boilers. | |
Technical Collaboration with M/s. Hobur Twente B.V., Netherlands for design & fabrication of LPG Bowsers. |
Year | Event |
---|---|
2001 | Certified to the revised ISO 9001:2000 Quality Management standard. |
Developed in-house basic design capability for Fired & Waste Heat Recovery Boilers. |
Year | Event |
---|---|
2003 | First project in Oil & Gas Sector received from M/s OMV for Qadanwari site. |
Joint Venture with M/s. Ranhill, Malaysia. | |
Shifted from Kot Lakhpat to expanded Engineering Works, Multan Road, Lahore. | |
Acquired ASME ‘S’ & ‘U’ stamps certification. |
Year | Event |
---|---|
2004 | Received first major project requiring ASME stamped vessels in Oil & Gas sector with M/s. Ranhill from M/s. PPL for expansion of their LPG / NGL gas field. |
Exported largest Fired Boiler of 31 TPH @ 12 Bars (g) with twin furnaces. |
Year | Event |
---|---|
2005 | Exported 5 TPH @ 10 Bars (g) Fired Boiler, S.S. Syrup tanks and Waste Water Treatment Plant to Kabul, Afghanistan. |
2006 | Received order from OGDCL for Three Phase Separator in collaboration with M/S Challanger Process System-USA. |
2007 | Acquired National Board ‘R’ stamp certification. |
Year | Event |
---|---|
2008 | Gas Filter Separators (ASME “U” Stamped) developed first time in Pakistan in collaboration with Perry Equipment Corporation (PECO) USA, delivered to Sui Northern Gas Pipelines Ltd (SNGPL), Pakistan. |
Received 1st order for Combined Cycle Plant using exhaust gases from 06 gas engines to produce 1200 KW Power. (INTERNATIONAL INDUSTRIES LIMITED) | |
2009 | Acquired ASME ‘U2’ Stamp Certification. Coalascer Vessels (ASME ‘U’ Stamped) were designed and manufactured by DDFC in Collaboration with Perry Equipment Corporate (PECO) USA for MOL Pakistan. |
Year | Event |
---|---|
2010 | Acquired Received order from SSGC, MOL, & OGDCL for Vertical Scrubbers and Knock Out Drum. |
Year | Event |
---|---|
2013 | Exported 2 X 10 TPH Fired boilers to Iraq. |
Exported first Quadruplex Waste Heat Recovery boiler to Bangladesh. |
Year | Event |
---|---|
2014 | Received second order for Combined Cycle Plant using exhaust gases from 4 gas engines to produce 900 KW power. |
Recertification of ASME Stamps “U”, “U2” & “R”. | |
Recertification of ISO 9001:2008. |
Year | Event |
---|---|
2015 | Received repeat order for 2×1200 LTR SS316l manufacturing vessels with limpet coil, agitator, drive and instrumentation for Abbott laboratories Karachi. |
3 Deodorizer vessels in SS304 with internal heating coils for United Industries Faisalabad. | |
8 No SS316L hygienic vessels for Pacific Pharma Lahore. | |
6 No SS316L manufacturing and storage vessels with heating jacket, agitator, drive and mechanical seals for Barret Hodgson. | |
Duplex WHRB with S.S economizer and corten steel ducting for Wartsila multi fuel engines at 10 meters below ground level. |
Year | Event |
---|---|
2016 | 09 Nos. SS316L hygienic vessels (jacketed and non-jacketed) for Pacific Pharmaceuticals Lahore. |
07 Nos. CS tanks for Pacific Pharmaceuticals Lahore. | |
07 Nos. SS316L manufacturing and storage vessels with agitators and U.S drives for Barrett Hodgson, Karachi. | |
01 Nos. SS316L cooking vessel with steam jacketed and insulation for Barrett Hodgson, Karachi. | |
15 TPH @ 10 bar (g) Fired Boiler for United Towel Exporter, Karachi. | |
3.1 TPH @ 10 bar (g) DWHRB for Din Testile Lahore. | |
3 TPH @ 10 bar (g) Fired Boiler for Shaukat Khanam Hospital Peshawar. | |
6.3 TPH @ 10 bar (g) Duplex WHRB for furnace oil engines for Bhanero Energy, Sheikhupura. | |
5.3 TPH @ 10 bar (g) Duplex WHRB for HFO engines for Ghazi Fabrics Multan Road Lahore. | |
2 TPH @ 10 bar (g) DWHRB for Natural Gas + Diesel engines for Haleeb Foods Multan Road Lahore. | |
3 TPH @ 12 bar (g) Fired Boiler for Rudolf Pakistan, Lahore. | |
7.65 TPH @ 10 bar (g) DWHRB for HFO engines for Interloop Faisalabad. |
Year | Event |
---|---|
2017 | 1.3 TPH @ 10 bar (g) Simplex WHRB for Fazal Rehman Fabrics Ltd., Multan. |
4.10 TPH @ 10 bar (g) Triplex WHRB for Fazal Cloth Mills Ltd., Multan. | |
3 TPH @ 10 bar (g) Smoke Tube Fired Boiler for DDFC Customer. | |
15 TPH @ 10 bar (g) Dual Fuel (N. Gas + HFO) Fired Boiler for Haleeb Foods Limited, Bhaiphero. | |
Economizer, Ducting and “Y” piece for existing DDFC WHRB # 1089 for Reliance Weaving Mills Ltd, Multan. | |
3.02 TPH @ 16.5 bar (g) Superheated Duplex WHRB for International Steel Limited, Karachi. | |
3 TPH @ 10 bar (g) Dual Fuel (N. Gas + HFO) Smoke Tube Fired Boiler for Barrett Hodgson Pakistan Pvt. Ltd., Karachi. | |
1 TPH @ 10 bar (g) Smoke Tube Fired Boiler for DDFC. | |
Modification of existing 03 Nos. DWHRB (JOB # 1243, 1244 & 1245) for enhancement of capacity for International Steel Limited, Karachi. | |
3.070 TPH @ 20 bar (g) Superheated Steam Triplex WHRB for Pakistan Refinery Limited, Karachi. | |
Combined Cycle Project comprising 02 Nos. Simplex WHRB (on exhaust of 07 gas engines) with Superheated Steam, Steam Turbine (MAN) & Cooling Towers to generate 1,625 KW @ 100% load for Fazal Cloth Mills Limited, Muzafargarh. | |
2.16 TPH @ 10 bar (g) Duplex WHRB for International Textile Limited, Karachi. | |
Recertification of ASME stamps ‘U’ & ‘S’. | |
Recertification of ISO 9001:2015. |
Year | Event |
---|---|
2018 | 3.070 TPH @ 20 bar (g) Triplex WHRB for Pakistan Refinery Limited, Karachi. |
2.6 TPH @ 10 bar (g) Duplex WHRB for International Textile Ltd, Karachi. | |
1.1 TPH @ 10 bar (g) Simplex WHRB for US Apparel Limited, Unit -2 Lahore. | |
Power Generation Combined Cycle Project: 4.5 TPH & 5.40 TPH @ 17 bar (g) with 360°C super heated steam Simplex WHRB’s coupled with MAN Turbine for power output of 1625KW. |
Year | Event |
---|---|
2022 | Waste Heat Recovery boiler connected to 05 engines produces 5 TPH saturated steam at 12.5 bar (g). Expander utilizing this steam to deliver 340 KW of Power. |
Year | Event |
---|---|
2023 | 288 US GPM @ 5.5 Bar (g) Fired Hot Water Generator (Three Pass Reverse Flame Wetback) for Paragon Contractors Pvt Ltd. |
Year | Event |
---|---|
2024 | DDFC Authorized from OGRA to Manufacture LPG Bullets/Bowser/Storage Tanks. |