Milestones

Year Event
1980 Registered as a Private Limited Firm with the name of Design Development Fabrication Company (DDFC).
Set up a modest fabrication unit at a rented premises in Shadbagh, Lahore.
Year Event
1982 Shifted Workshop to self-owned property at Kot Lakhpat Industrial Estate, Lahore.
Year Event
1984 Started hygienic grade fabrication for Food Processing & Pharmaceutical Industries. The following equipment was added for this: Dish end forming & Flanging Machine, Automatic Seam Welding machines & Distortion Removing Machine.
Year Event
1985 Developed machine for polishing Stainless Steel Tanks.
1986 Developed direct expansion electric motor & diesel engine driven Milk Chilling Units.
1989 Licensing agreement with Beel Industrial Boilers Plc, U.K. for Packaged Smoke Tube Fired & Waste Heat Recovery Boilers.
Technical Collaboration with M/s. Dontare Ltd., U.K. for Water & Waste Water Treatment Plants.
Year Event
1992 Design and construction of first Waste Water Treatment Plant undertaken for ICI Polyester, Sheikhupura.
First Fired Boiler manufactured.
Technical collaboration with M/s. Lurgi GmbH, Germany for Solvent Extraction Plants.
Year Event
1995 First Waste Heat Recovery Boiler manufactured.
1997 Re-incorporated as DDFC (Pvt.) Ltd.
Year Event
1998 Obtained the ISO 9001:1994 Quality Management certification.
Technical collaboration with M/s. Aalborg Industries, Sweden for Water Tube Waste Heat Recovery Boilers.
Technical Collaboration with M/s. Hobur Twente B.V., Netherlands for design & fabrication of LPG Bowsers.
Year Event
2001 Certified to the revised ISO 9001:2000 Quality Management standard.
Developed in-house basic design capability for Fired & Waste Heat Recovery Boilers.
Year Event
2003 First project in Oil & Gas Sector received from M/s OMV for Qadanwari site.
Joint Venture with M/s. Ranhill, Malaysia.
Shifted from Kot Lakhpat to expanded Engineering Works, Multan Road, Lahore.
Acquired ASME ‘S’ & ‘U’ stamps certification.
Year Event
2004 Received first major project requiring ASME stamped vessels in Oil & Gas sector with M/s. Ranhill from M/s. PPL for expansion of their LPG / NGL gas field.
Exported largest Fired Boiler of 31 TPH @ 12 Bars (g) with twin furnaces.
Year Event
2005 Exported 5 TPH @ 10 Bars (g) Fired Boiler, S.S. Syrup tanks and Waste Water Treatment Plant to Kabul, Afghanistan.
2006 Received order from OGDCL for Three Phase Separator in collaboration with M/S Challanger Process System-USA.
2007 Acquired National Board ‘R’ stamp certification.
Year Event
2008 Gas Filter Separators (ASME “U” Stamped) developed first time in Pakistan in collaboration with Perry Equipment Corporation (PECO) USA, delivered to Sui Northern Gas Pipelines Ltd (SNGPL), Pakistan.
Received 1st order for Combined Cycle Plant using exhaust gases from 06 gas engines to produce 1200 KW Power. (INTERNATIONAL INDUSTRIES LIMITED)
2009 Acquired ASME ‘U2’ Stamp Certification. Coalascer Vessels (ASME ‘U’ Stamped) were designed and manufactured by DDFC in Collaboration with Perry Equipment Corporate (PECO) USA for MOL Pakistan.
Year Event
2010 Acquired Received order from SSGC, MOL, & OGDCL for Vertical Scrubbers and Knock Out Drum.
Year Event
2013 Exported 2 X 10 TPH Fired boilers to Iraq.
Exported first Quadruplex Waste Heat Recovery boiler to Bangladesh.
Year Event
2014 Received second order for Combined Cycle Plant using exhaust gases from 4 gas engines to produce 900 KW power.
Recertification of ASME Stamps “U”, “U2” & “R”.
Recertification of ISO 9001:2008.
Year Event
2015 Received repeat order for 2×1200 LTR SS316l manufacturing vessels with limpet coil, agitator, drive and instrumentation for Abbott laboratories Karachi.
3 Deodorizer vessels in SS304 with internal heating coils for United Industries Faisalabad.
8 No SS316L hygienic vessels for Pacific Pharma Lahore.
6 No SS316L manufacturing and storage vessels with heating jacket, agitator, drive and mechanical seals for Barret Hodgson.
Duplex WHRB with S.S economizer and corten steel ducting for Wartsila multi fuel engines at 10 meters below ground level.
Year Event
2016 09 Nos. SS316L hygienic vessels (jacketed and non-jacketed) for Pacific Pharmaceuticals Lahore.
07 Nos. CS tanks for Pacific Pharmaceuticals Lahore.
07 Nos. SS316L manufacturing and storage vessels with agitators and U.S drives for Barrett Hodgson, Karachi.
01 Nos. SS316L cooking vessel with steam jacketed and insulation for Barrett Hodgson, Karachi.
15 TPH @ 10 bar (g) Fired Boiler for United Towel Exporter, Karachi.
3.1 TPH @ 10 bar (g) DWHRB for Din Testile Lahore.
3 TPH @ 10 bar (g) Fired Boiler for Shaukat Khanam Hospital Peshawar.
6.3 TPH @ 10 bar (g) Duplex WHRB for furnace oil engines for Bhanero Energy, Sheikhupura.
5.3 TPH @ 10 bar (g) Duplex WHRB for HFO engines for Ghazi Fabrics Multan Road Lahore.
2 TPH @ 10 bar (g) DWHRB for Natural Gas + Diesel engines for Haleeb Foods Multan Road Lahore.
3 TPH @ 12 bar (g) Fired Boiler for Rudolf Pakistan, Lahore.
7.65 TPH @ 10 bar (g) DWHRB for HFO engines for Interloop Faisalabad.
Year Event
2017 1.3 TPH @ 10 bar (g) Simplex WHRB for Fazal Rehman Fabrics Ltd., Multan.
4.10 TPH @ 10 bar (g) Triplex WHRB for Fazal Cloth Mills Ltd., Multan.
3 TPH @ 10 bar (g) Smoke Tube Fired Boiler for DDFC Customer.
15 TPH @ 10 bar (g) Dual Fuel (N. Gas + HFO) Fired Boiler for Haleeb Foods Limited, Bhaiphero.
Economizer, Ducting and “Y” piece for existing DDFC WHRB # 1089 for Reliance Weaving Mills Ltd, Multan.
3.02 TPH @ 16.5 bar (g) Superheated Duplex WHRB for International Steel Limited, Karachi.
3 TPH @ 10 bar (g) Dual Fuel (N. Gas + HFO) Smoke Tube Fired Boiler for Barrett Hodgson Pakistan Pvt. Ltd., Karachi.
1 TPH @ 10 bar (g) Smoke Tube Fired Boiler for DDFC.
Modification of existing 03 Nos. DWHRB (JOB # 1243, 1244 & 1245) for enhancement of capacity for International Steel Limited, Karachi.
3.070 TPH @ 20 bar (g) Superheated Steam Triplex WHRB for Pakistan Refinery Limited, Karachi.
Combined Cycle Project comprising 02 Nos. Simplex WHRB (on exhaust of 07 gas engines) with Superheated Steam, Steam Turbine (MAN) & Cooling Towers to generate 1,625 KW @ 100% load for Fazal Cloth Mills Limited, Muzafargarh.
2.16 TPH @ 10 bar (g) Duplex WHRB for International Textile Limited, Karachi.
Recertification of ASME stamps ‘U’ & ‘S’.
Recertification of ISO 9001:2015.
Year Event
2018 3.070 TPH @ 20 bar (g) Triplex WHRB for Pakistan Refinery Limited, Karachi.
2.6 TPH @ 10 bar (g) Duplex WHRB for International Textile Ltd, Karachi.
1.1 TPH @ 10 bar (g) Simplex WHRB for US Apparel Limited, Unit -2 Lahore.
Power Generation Combined Cycle Project: 4.5 TPH & 5.40 TPH @ 17 bar (g) with 360°C super heated steam Simplex WHRB’s coupled with MAN Turbine for power output of 1625KW.
Year Event
2022 Waste Heat Recovery boiler connected to 05 engines produces 5 TPH saturated steam at 12.5 bar (g). Expander utilizing this steam to deliver 340 KW of Power.
Year Event
2023 288 US GPM @ 5.5 Bar (g) Fired Hot Water Generator (Three Pass Reverse Flame Wetback) for Paragon Contractors Pvt Ltd.
Year Event
2024 DDFC Authorized from OGRA to Manufacture LPG Bullets/Bowser/Storage Tanks.